Main classroom building still under construction. The
bottom three
floors are in use -
Photo - Jerry Reynolds -
December 2000
|
To the left is the college classroom building - Ghana
Bible College |
Top floor college under construction. This room
will be an auditorium
|
A view of the ceiling of the top
floor under construction - Ocober 2000
|
Outside of the Top floor classrooms under construction
|
Dr. Obeng and Dan Boyd in front of
the Bible College Library
|
Books being cataloged for the library
|
The College Library
Dr. Obeng on the right
|
Computers donated by
Riverside Church of Christ
set up in the classroom
|
Computer teacher at the Bible College
|
Ghana Bible College staff
with
Dan Boyd and David
Parsley
|
Dan Boyd meeting with the staff
|
More of the staff meeting
|
The matriculation of new students October 2000
|
The new students sign the registration log becoming official
students |
Students cleaning the Bible College steps - October 2000
|
Dan Boyd talking to the
Bible College Students
|
Class at the Bible College
|